The location of the MF90 installation trunk must be noted on the vessel’s docking plan for future reference.
Make sure that ample clearance under the MF90 installation trunk and/or blister is provided when you are placing the vessel in dry dock. Avoid locating supporting blocks or structures in the vicinity of the MF90 installation trunk.
ImportantPrior to dry docking, turn off the MF90 system. If necessary, disengage the circuit breaker. Label the Processor Unit and/or the circuit breaker clearly to prevent anyone from accidentally turning on the MF90 system.